Patana Sports Village

Bulk Update Pile Locations

Update existing pile locations using pile_ref as the matching key. Blank cells do not change existing values. Use __clear__ to clear a value.

Existing pile_ref

These are valid pile references you can update.

pile_refzone
A-01Zone A
A-02Zone A
A-03Zone A

Valid pile_product_code

Use these codes if you need to update pile product.

I-PILE-STD-12M

SPUN-300-12M

SQ-220X220-12M

SQ-220X220-6M

SQ-260X260-12M

TIS396-S-220X220-10M-J-STD

TIS396-S-220X220-12M-NJ-STD

Valid structure_node_code

Use these codes to assign pile locations to project structure.

No structure nodes found.

1. Upload CSV or drag file here

Use this to correct imported pile locations after drawing review.

Download Template

2. Or paste table data

Copy rows directly from Excel or Google Sheets, including the header row.

3. Preview

Required matching column: pile_ref. All other columns are optional.

No preview yet. Upload a CSV file, drag one into the box, or paste table data above.

Bulk update rules

pile_ref is used to find the existing pile location.

Blank cells do not change existing values.

Use __clear__ to clear a field.

Use new_pile_ref to rename an existing pile reference.

Cancel